40 Years

125 Queen St. This iconic building was enjoyable to work on as we solved problems from the basement to level 29. The roofs at Level 29 and Level 3 had a very tired Brownbuild, and the best solution was to refall all the gutters and install EPS to the pans (packers) with Nuratherm Warm Board over that, completed with Nuralite Two Layer 3PM Carbon Membrane to finish.

Over the past 16 years, I am proud to have lead Terracon through the completion of nearly 5000 projects, ranging from very small to very large. With Terracon’s proven track record of innovative and successful outcomes for our clients and a commitment to the highest standard of workmanship, your project is in safe hands. We have an impressive display of products and mock ups (see picture) for you to peruse at our office. So when you’re after solutions to a problem or best product fit for a specific outcome, please call us or, better still, stop by our place to discuss your needs.