40 Years

Project Summary

We completed this 2000 m2 roof with Nuralite 3PM on Nuratherm PIR Warm Board. We achieved this by first setting out the 1 degree PIR boards 600mm wide to create all internal gutters, then perpendicular to that we installed 2 degree EPS board, either to a parapet or internal ridge. On top of the EPS board for strength and fire resistance, we installed PIR Nuratherm Warm Board. With this install we also incorporated ILD leak detection testing. A fantastic result was accomplished for those who will enjoy this beautiful building.

Over the past 16 years, I am proud to have lead Terracon through the completion of nearly 5000 projects, ranging from very small to very large. With Terracon’s proven track record of innovative and successful outcomes for our clients and a commitment to the highest standard of workmanship, your project is in safe hands. We have an impressive display of products and mock ups (see picture) for you to peruse at our office. So when you’re after solutions to a problem or best product fit for a specific outcome, please call us or, better still, stop by our place to discuss your needs..